All services

Site inspections and quality assurance

Some parts of a building project are visible for only a short time. A trench is backfilled or concrete is poured. Scandico helps agree what needs to be seen and when it will still be accessible.

When is an inspection most useful?

The timing follows the work. We compare the programme with the elements that will be concealed and agree when the contractor will notify us. An inspection might take place before a drainage trench is backfilled.

What is checked and recorded?

At the agreed inspection points, we compare the visible work with the drawings, specifications and agreed requirements. We review relevant measurements, photographs and other quality records provided by the contractor.

If we find a discrepancy, we record its location, what was observed and who needs to respond. Follow-up may be through supporting records or a further visit, depending on the issue.

Agree the scope before the first visit

  • Which works and inspection points matter most to this project?
  • Who will give notice, and when will the work be covered?
  • Who receives the inspection note and follows up on outstanding items?

Inspections cover the agreed scope. The contractor remains responsible for carrying out its own quality checks.